Hoisting & Rigging Equipment Support Services
- Response deadline
- Oct 20, 2026 Due in 20 days
- Date posted
- Sep 30, 2026
- Source
- Open notice
Description
Princeton Plasma Physics Laboratory is looking to acquires PPPL personnel perform much of the routine required inspections; however, during peak workload periods and for large repairs, the Subcontractor may be called upon on to perform these tasks. This SOW provides the requirements for subcontracted periodic inspections. It also addresses the assignment to a Subcontractor of the requirement to perform remedial (corrective) maintenance, which may be determined necessary based upon the periodic inspections, in order to make a piece of equipment operable in accordance with governing codes and standards, and the performance of routine maintenance as recommended by the various equipment manufacturers. Unless specified and agreed to otherwise in writing, PPPL requires that the work be performed in accordance with the manufacturer specifications and procedures. After any maintenance is performed, a complete thorough check of equipment function shall be performed including all safety features and interlocks as described by the manufacturer. Additionally, the Subcontractor may be called upon for advice for crane upgrades and performance enhancements. Several large cranes (Items 3, 13, 33, 34 on Attachment A) are retrofitted with Catron/Electromotive radio remote controls and Variable Frequency Drives. Familiarity with and qualification in maintenance and adjustments of these cranes and control systems is mandatory. Subcontractor's membership in the Crane Manufacturers Association of America (CMAA) is regarded as highly desirable, and a measure of the Subcontractor's professionalism and technical qualification for performing tasks such as assigned under the Statement of Work.PPPL does not guarantee any minimum level of work and reserves the right to use other sources to perform the inspection and maintenance tasks when PPPL determines this to be appropriate A mandatory preproposal zoom meeting has been scheduled for 1:30 PM on 8 Oct 2026. Zoom invitations will only be sent to firms completing and submitting an RFP acknowledgement form
Classifications
Documents (12)
- Section V - Forms_PPPLRepsCerts_2025.pdf.pdf334 KBNot yet available
- PPPL-PD-CTC (Commercial) Rev 26_Feb2024.pdf.pdf230 KBNot yet available
- Section IV - RFP 26-081JR Evaluation and Basis for Award.pdf.pdf.pdf160 KBNot yet available
- PPPL-PD-S (Service Contract Labor Standards)- Rev 8_Sept2022.pdf.pdf169 KBNot yet available
- PPPL-PD-F (TM) Rev 10_Feb2024.pdf.pdf154 KBNot yet available
- Section I - SOW_Hoisting and Rigging Services.pdf.pdf6.7 MBNot yet available
- Section III - RFP 26-081JR Instructions.pdf.pdf221 KBNot yet available
- Section V SCA Wage Determination.pdf.pdf345 KBNot yet available
- Section V - Forms_E-Verify Certification Document.pdf.pdf109 KBNot yet available
- RFP 26-081JR Table of Contents.pdf.pdf110 KBNot yet available
- PPPL-PD-T Provisions For Work Performed On The PPPL Site-Rev 6_Jun2026x.pdf.pdf656 KBNot yet available
- Section II - RFP 26-081JR Sample Subcontract.pdf.pdf165 KBNot yet available
Contacts
- jrussell@pppl.gov6092433963
Similar contracts
- Fuel Tank InspectionDue Oct 16, 2026
- Automatic Door Repair ServicePennsylvaniaDue Oct 8, 2026
- Preventative Maintenance and Repair of Heavy Equipment for the Fort Mifflin Project OfficeDue Oct 30, 2026
- Wagner Paint ProportionerUtahDue Oct 7, 2026
- Inspection & Testing of Electric and Diesel Fire Pumps, Engines, Controllers, and Oil/Water Separator at NWS Earle, BLDG R38New JerseyDue Oct 14, 2026
- Equipment Support Services (Ess) GuamDue Oct 31, 2026