EOU Sunshades Creech AFB
- Response deadline
- Sep 3, 2026 Due in 8 days
- Date posted
- Aug 26, 2026
- Source
- Open notice
Description
The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site. Also, the relocation of the four existing structures and demolition of the 5th sunshade. Four current sunshades will be turned perpendicular and align with the new sunshades. The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron: 1) Four CCA shade structures that include four aircraft parking bays each. The new shade structures will be located on south ramp west of the current shade structures. 2) Column concrete footings, per footing, as needed. 3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light. 4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure. ***This solicitation has been amended on 10 August 2026 to include attachment 4: EOU Sunshade RFI.*** ***This solicitation has been amended on 26 August 2026 to extend the quote due date to 3 September 2026.*** Attachment 1: Combo Attachment 2: SOW Attachment 3: Sunshade Map Attachment 4: EOU Sunshade RFI
Classifications
Documents (5)
- Attachment 5 - EOU Sunshade RFI - 26Aug26.pdf.pdf186 KBNot yet available
- Attachment 3 - Sunshade Map.pptx.pptx759 KBNot yet available
- Attachment 1 - Combo 1.pdf.pdf1.7 MBNot yet available
- Attachment 2 - EOU Sunshades - SOW.pdf.pdf2.0 MBNot yet available
- Attachment 4 - EOU Sunshade RFI.pdf.pdf64 KBNot yet available
Contacts
Similar contracts
- Cannelton Lock and Dam - culvert valve assembliesIndianaDue Sep 14, 2026
- TILLAMOOK AND MARY'S PEAK ROAD GATESDue Sep 5, 2026
- FY26 Antiterrorism Portable BarriersIllinoisDue Sep 8, 2026
- FLAT BAR, PIPE, METALDue Sep 2, 2026
- Boat Topside StanchionsGeorgiaDue Sep 9, 2026
- TRAILER TOWER SYSTEMFloridaDue Aug 31, 2026