Spectrum Analyzer
- Response deadline
- Sep 3, 2026 Due in 15 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
NON-MANUFACTURER RULE WAIVER This sources sought is posted in pursuance of a non-manufacturer rule (NMR) waiver with the Small Business Administration (SBA) for the procurement of a spectrum analyzer under NAICS 334515. The SBA currently does not have a class NMR waiver for this NAICS. If your entity is a small business manufacturer of spectrum analyzers under NAICS 334515; please reach out to the listed points of contact. Upon reaching out, entities will be provided the Statement of Need (SON). Entities shall respond whether they manufacture a spectrum analyzer that meets the requirements outlined in the SON. SOURCES SOUGHT The 55th Contracting Squadron has an ongoing requirement to acquire a fixed (desk-top) or portable (handheld) spectrum analyzer. It is imperative to the mission of the 55th Communications Squadron that the spectrum analyzer exhibits the following specifications: Signal and Frequency Range Minimum: Between 2 Hz and 9 kHz Maximum: Between 85 GHz and 275 GHz Phase Noise Phase noise must be no greater/louder than -140 dBc/Hz at 10 kHz offset Additional equipment specifications/capabilities required will be provided in the SON once available All responsible entites my submit a response. Responses shall include the following information: Entity Name CAGE/SAM UEI Business Size Requirement would be fulfilled as a manufacturer or reseller Capabilities Statement Please email this information to both listed points of contacts. This sources sought posting fulfills the pre-solicittion requirements in accordance with RFO 5.101(c).
Classifications
Documents
No documents posted for this opportunity.
Contacts
- tyler.imhoff.1@us.af.mil4022946005
- joi.harvey.2@us.af.mil4022322371
Similar contracts
- Multi-Product CalibratorDue Sep 2, 2026
- Test, Diagnostic, and Measurement EquipmentArizonaDue Aug 27, 2026
- Aviation Flight Line Test EquipmentDue Aug 31, 2026
- 81 EWS Agile Signal Generator RQMT-28674GeorgiaDue Aug 21, 2026
- Thermostatic Switch Test SetDue Sep 2, 2026
- Power Sensor Check StandardDue Aug 19, 2026