PN: 636-26-502, Replace CLC Flooring (GI)
- Response deadline
- Sep 2, 2026 Due in 11 days
- Date posted
- Aug 22, 2026
- Source
- Open notice
Description
Amendment 0001 incorporates a copy of the ICRA, Site Visit attendance sheet, responses to the Site Visit questions and a revised DBA Wage Determination. This project includes all labor, management, and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1,on the 3rd and 2nd Floors. All measurements/dimensions existing blueprints are approximate. Contractor must verify all measurements/dimensions. The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval. The Contractor shall match existing conditions at each location. The contractor will be responsible for and shall repair any excessive damage caused by the removal/demolition of existing materials or the installation of new materials.
Classifications
Documents (11)
- Drawing_GRI 2nd-3rd Flrs_Rplc Flooring.pdf.pdf1.1 MBNot yet available
- WD NE20260047_636-26-502.pdf.pdf2.0 MBNot yet available
- AS06_A0001_Revised DBA WD_NE20260069.pdf.pdf63 KBNot yet available
- VAAR 852.219-75_VA Notice of Limitations on Subcontracting.pdf.pdf133 KBNot yet available
- NARA Mgt_TMS 20939 No Access FY24_Emplys Read-Sign.pdf.pdf63 KBNot yet available
- AS06_36C26326B0036 0001_IFB_Rplc CLC Flooring_GI.pdf.pdf172 KBNot yet available
- AS06_A0001_ICRA_636-26-502.pdf.pdf374 KBNot yet available
- AS06_A0001_Consolidated Site Visit QAs_636-26-502.pdf.pdf105 KBNot yet available
- 36C26326B0036_IFB_Rplc CLC Flooring_GI.pdf.pdf679 KBNot yet available
- AS06_A0001_Site Visit Attendance_636-26-502.pdf.pdf126 KBNot yet available
- Final SOW_636-26-502_GI Flooring.pdf.pdf470 KBNot yet available
Contacts
- Contracting Officermichael.freeman3@va.gov(402) 996-3538
- Contracting Officercalvin.courtney@va.gov605.347.2511 Ext 1-8006
Similar contracts
- Z2DA--657A5-21-401, Construct New Campus Chiller Plant, MRNIllinoisDue Sep 2, 2026
- B3340 and B2443 Playground ResurfacingCaliforniaDue Aug 27, 2026
- 115 FW Construct Alert GOV Parking ShelterWisconsinDue Sep 10, 2026
- Design-Build Maintenance and Repair of the General Stilwell Memorial Army Reserve Center (ARC) Training Building 1520, TXTexasDue Aug 31, 2026
- Lucky Peak Nursery New GreenhouseIdahoDue Sep 8, 2026
- Replace Carpet Offices, VMGR252, Building 4305North CarolinaDue Sep 7, 2026