B515 Carpet and Vinyl Installation
- Response deadline
- Sep 18, 2026 Due in 15 days
- Date posted
- Sep 3, 2026
- Source
- Open notice
Description
Amendment 1: This amendment is to add information about the site visit. The site visit will take place at Building 515, address: 101 55th St BLDG.515 Offutt AFB, NE 68113 Show time is still 9:00 AM. Please take into account possible traffic and security measures when it comes to timing. The base entrance you will go through will be the STRATCOM Gate. The on-site point of contact will be SSgt Eyvind Boyesen, 402-232-2287 Amendment 2: This amendment is to address more questions about the site visit. Q. With my EAL information submitted, should I proceed directly to the STRATCOM Gate for entry, or do I need to report to the Visitor Control Center first? A. You will go straight to the gate. You will tell the Security Forces member that you are a contractor here for a site visit at B515 and that there should be an EAL for you. Q. What identification and vehicle documents should I have with me? A. A valid state issued drivers license or ID will suffice. Q. Are photographs or video permitted during the site visit for documenting flooring conditions, measurements, transitions, and other estimating details? A. The area is a sensitive compartmented information facility (SCIF), so no photographs will be allowed. Q. Are there any restrictions on cell phones, cameras, tablets, or other electronic devices inside Building 515? A. Yes. All electronics will be unallowable for this site visit. Q. If photography or video is permitted, does it require prior approval or need to be limited to specific areas? A. Please see prior answer. Q. Once through the gate, should I proceed directly to Building 515, or is there a designated location where the site-visit group will meet? A. Yes proceed directly to B515. We will meet there. Building 515 Carpet Installation The Contractor shall provide all personnel, equipment, tools, materials, supervision, administration, and services necessary to remove existing carpet flooring and install new carpet and vinyl in specified areas of building 515. More information can be found in Attachment 1_515 Carpet Performance Work Statement_27Aug26 Site Visit: A site visit will take place on 09 Sept 2026 from 9:00 AM - 10:30 AM CDT. Attendees must fill out the bottom portion of Attachment 3_EAL_27Aug26 and return to the contracting office no later than 03 Sept 2026 at 3:00 PM CDT to ensure base access for the site visit. Questions: Questions will be due Sept 14, 2026, at 1100 CDT
Classifications
Documents (4)
- Attachment 1_515 Carpet Performance Work Statement_27Aug26.pdf.pdf1.2 MBNot yet available
- Attachment 3_EAL_27Aug26.docx.docx37 KBNot yet available
- Attachment 2_Wage Determinations_27Aug26.txt.txt43 KBNot yet available
- Solicitation - FA460026Q0117.pdf.pdf528 KBNot yet available
Contacts
- ethan.taylor.22@us.af.mil4022322288
- eyvind.boyesen@us.af.mil4022322287
Similar contracts
- 1947 Remove and Replace Carpet - Shaw AFBSouth CarolinaDue Sep 10, 2026
- Patrick SFB Carpet ReplacementFloridaDue Sep 11, 2026
- Multi-Building Carpet & LVPSouth CarolinaDue Sep 10, 2026
- Patrick SFB Carpet ReplacementFloridaDue Sep 4, 2026
- Multi-Building Carpet & LVPSouth CarolinaDue Sep 10, 2026
- 1947 Remove and Replace Carpet - Shaw AFBSouth CarolinaDue Sep 7, 2026