Y1DA--637-22-700 | EHRM Infrastructure Upgrades | Ashville, NC |
- Response deadline
- Jul 13, 2026 Closed
- Date posted
- Jun 29, 2026
- Source
- Open notice
Description
Amendment 0003 has been posted. This amendment extends the date for offers due to 7/13 at 3PM EDT. Amendment 0002 has been posted. This amendment extends the date for offers due to 7/1 at 3PM EDT. Amendment 0001 has been posted along with its attachments. This amendment adds the site visit sign-in sheet and agenda from the site visit on 6/9. The contractor shall provide all tools, equipment, materials, labor, supervision, and management to complete the construction of infrastructure upgrades to the campus. Construction practices shall comply with all VA solicitation drawings and specifications, VA regulations, procedures, and conditions for work at the medical center and any applicable codes as per requirements of all governing agencies. Work includes, but is not limited to, electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, asses for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes, cable), Renovation Datacenter work (HVAC, UPS, Power distribution, cable management, expansion of space, fire suppression, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project buildings include: Buildings 47, 62, 14, 15, 9, 7, 6, 5, 4, 3, 2, 73, 70, 11, 12 and site. Contractor shall complete the intent of project 637-22-700 in strict accordance with the drawings and specifications. All work not specifically identified by the drawings and/or specifications but necessary for a complete system shall be included as if specifically identified in the Contract Documents.
Classifications
Documents (19)
- DownloadAttachment 8 - Limitations on Subcontracting - Construction.docx.docx28 KB
- DownloadAttachment 5 - Drawings Volume IV.pdf.pdf20.3 MB
- Download36C77626R0066.pdf.pdf585 KB
- DownloadAttachment 1 - Specifications.pdf.pdf17.3 MB
- DownloadAttachment 13 - Site Visit Details.pdf.pdf22 KB
- DownloadAttachment 6 - Drawings Volume V.pdf.pdf13.5 MB
- DownloadAttachment 10 - Key Personnel.docx.docx101 KB
- DownloadAmendment 0001 - Site Visit Agenda.pdf.pdf129 KB
- DownloadAmendment 0002.pdf.pdf85 KB
- DownloadAttachment 3 - Drawings Volume II.pdf.pdf21.3 MB
- DownloadAttachment 4 - Drawings Volume III.pdf.pdf12.2 MB
- DownloadAttachment 9 - Key Subcontractor Information.docx.docx98 KB
- DownloadAttachment 2 - Drawings Volume I.pdf.pdf28.5 MB
- DownloadAttachment 11 - Division Pricing Template.xlsx.xlsx10 KB
- DownloadAttachment 7 - Drawings Volume VI.pdf.pdf9.5 MB
- DownloadAmendment 0001.pdf.pdf83 KB
- DownloadAmendment 0001 - Site Visit Sign In.pdf.pdf995 KB
- DownloadAmendment 0003.pdf.pdf84 KB
- DownloadAttachment 12 - Wage Determination.pdf.pdf36 KB
Contacts
- Andrew Mathewsandrew.mathews2@va.gov216-447-8300
- Scott Elias