nc_evp274-RW-WTP-FY26-Backup Power Generation Services-5220-604-2026
Open
To provide timely, reliable, and expert-level on-call emergency and scheduled repair services for backup power generation systems for Raleigh Water. This includes the Water and Wastewater Treatment…
- Response deadline
- Sep 14, 2026 Due in 38 days
- Date posted
- Aug 7, 2026
- Source
- Open notice
Description
To provide timely, reliable, and expert-level on-call emergency and scheduled repair services for backup power generation systems for Raleigh Water. This includes the Water and Wastewater Treatment Plants, pump stations, lift stations, elevated and ground storage tank sites and booster pump stations. The City reserves the right to enter into one or more contracts with firms based on price, location of services, hours of operation, and/or availability of services with minimum delay. No representation or guarantee is made regarding the quantity of work to be awarded under any as‐needed service contract. The City reserves the right to add additional locations that could benefit from this solicitation as needed.
Documents (1)
- RFP Generator MSA.pdfapplication/pdf513 KBNot yet available
Contacts
Similar contracts
- To plan and execute the annual THP maintenance shutdown for the Cambi B6‑4 Thermal Hydrolysis Process (THP) at the Neuse River Resource Recovery Facility (NRRRF). The selected firm will provide OEM…NCDue Sep 8, 2026
- Little Creek Resource Recovery Facility Rehabilitation & Replacement Contract 2NCDue Aug 18, 2026
- Pursuant to NC General Statutes § 143-128.1A, the City of Raleigh is seeking one or more qualified design-build (DB) teams to provide design and construction services for the natural surface mounta…NCDue Sep 11, 2026
- Surface preparation and rust removal, and repainting of the Stair Tower, removal and
replacement of stair treads, and other ancillary work at the existing water slide at the
Buffalo Road Aquatic Ce…NCDue Sep 9, 2026
- The City of Raleigh is seeking bids from qualified vendors to furnish and deliver approximately 260,000 high-quality daffodil bulbs in the specified varieties for planting throughout the city.NCDue Sep 3, 2026
- The Project consists generally of the following major items: mechanical, plumbing, sheetrock,
electrical, painting, windows, and exterior stairs.NCDue Aug 28, 2026