nc_evp281-FB26251
Open
This project is at the Forsyth County DSS Power Plant. It includes the replacement of six 2MBH with two 3MBH boilers, the replacement of the cooling tower serving the Carrier chiller, and the repla…
CITY OF WINSTON-SALEM / Design-Build for Runnymede Water Infrastructure Improvements Project · NC
- Response deadline
- Jul 7, 2026 Closed
- Date posted
- Jun 8, 2026
- Source
- Open notice
Description
This project is at the Forsyth County DSS Power Plant. It includes the replacement of six 2MBH with two 3MBH boilers, the replacement of the cooling tower serving the Carrier chiller, and the replacement of the Carrier chiller. These systems have reached the end of their useful life and require replacement.
Documents (1)
- DownloadAd - DSS Chiller and Cooling Tower Replacement FB26251.pdfapplication/pdf218 KB
Contacts
- Russell Frye