nc_evp600600STCBoiler
Open
The work to be performed under this project consists of providing all labor, equipment, and materials necessary for the Sheriff’s training center boiler and pumps replacement.
- Response deadline
- Sep 11, 2026 Due in 15 days
- Date posted
- Aug 27, 2026
- Source
- Open notice
Description
The work to be performed under this project consists of providing all labor, equipment, and materials necessary for the Sheriff’s training center boiler and pumps replacement.
Documents (1)
- IFB - Sheriff Training Boiler (1).pdfapplication/pdf96 KBNot yet available
Contacts
Similar contracts
- A bid bond is required for this project.
Minority bidders are strongly encouraged to participate.
Performance and Payment Bonds are required.NCDue Sep 17, 2026
- IFB #27-9-IS JUSTICE SERVICES WATER/SEWER LINE REPLACEMENTNCDue Sep 8, 2026
- FAMPO is accepting proposals for the services of a firm/team to complete the 2055 Metropolitan Transportation Plan (MTP) and Congestion Management Process (CMP). Interested firms should respond by…NCDue Oct 9, 2026
- IFB #27-5-PI FAMPO BICYCLE & PEDESTRIAN COUNTING SYSTEMSNCDue Sep 4, 2026
- RFP #27-1-CTY DISASTER DEBRIS COLLECTION SERVICESNCDue Sep 9, 2026
- Single prime cooling tower manufacturer representative rebuild contractor shall provide all labor, equipment,
and materials necessary for turnkey cooling tower rebuild services for cooling tower 1 …NCDue Sep 30, 2026