Civic AI
Civic AI
Procurement intelligence
nc_evp445-2026-2
Open

The Town of Granite Falls, North Carolina (the "Town"), is soliciting proposals from qualified firms to provide a complete, integrated Advanced Metering Infrastructure ("AMI") system for the Town's…

Response deadline
Oct 22, 2026
Due in 2 days
Date posted
Oct 19, 2026

Description

The Town of Granite Falls, North Carolina (the "Town"), is soliciting proposals from qualified firms to provide a complete, integrated Advanced Metering Infrastructure ("AMI") system for the Town's water and electric utilities. The Town intends to select a single prime contractor/vendor capable of providing the AMI communications infrastructure, network design, meter data collection system, software, integration with the Town's existing utility billing system, water meter endpoints and/or registers, installation services, GPS location of water meters, training, testing, commissioning, and ongoing support. The proposed system shall provide the Town with a single AMI reading platform capable of collecting and managing data from both the Town's water meters and the Town's existing Itron electric meters. Existing electric meters are not included for replacement under this project. The Town currently has approximately: 2,715 electric meters 2,836 water meters Approximately 600–700 of the Town's existing Itron electric meters have been identified as AMI-compatible. The successful proposer shall evaluate and identify the equipment, communications technology, modules, and configuration necessary to incorporate the existing compatible Itron meters into the proposed AMI system. The Town's water meter inventory consists primarily of Neptune T-10 meter bodies, although other manufacturers and models are present. The Town intends to maximize the useful life of existing compatible water meter bodies by installing compatible AMI registers and/or endpoints where technically feasible and cost-effective. The Town recognizes that available project funding may not be sufficient to convert or replace all 2,836 water meters during the initial project. Accordingly, this RFP requires detailed unit pricing and phased implementation options.

Documents (1)

  • RFP - Advanced Metering Infrastructure (AMI) System.pdf
    application/pdf245 KBNot yet available

Contacts

Similar contracts

Explore more