The Project includes the following Work: 1. Rehabilitation of 200,000 Gallon 64-foot Diameter concrete Clearwell. 2. Two story filter building addition approximately 22 feet x 28 feet. a. Addit…

Response deadline
May 12, 2026
Closed
Date posted
Mar 31, 2026

Description

The Project includes the following Work: 1. Rehabilitation of 200,000 Gallon 64-foot Diameter concrete Clearwell. 2. Two story filter building addition approximately 22 feet x 28 feet. a. Addition will include two (2) 9 feet by 10 feet gravity filters b. Associated site work 3. Rehabilitation of the existing two (2) 9 ft x 10 ft gravity filters 4. SCADA system components