The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: Replacement of seven 24-inch butterfly val…
- Response deadline
- Dec 3, 2026 Due in 37 days
- Date posted
- Oct 27, 2026
- Source
- Open notice
Description
The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: Replacement of seven 24-inch butterfly valves, six slide gates, polymer application point, and all associated appurtenances as described in the Specifications and as shown on the Drawings. The foregoing description shall not be construed as a complete description of all work required. Beginning on 26, October, 2026, the Bidding Documents may be examined online at the following location: • McGraw Hill Construction / Dodge (dodge.construction.com) Complete Bidding Documents may be obtained from the office of the Engineer by emailing OWASARapidMixImprovements@hazenandsawyer.com . Electronic documents will be provided at no charge. Bidders shall attend a mandatory Pre-Bid Conference at 10:30 A.M., local time, on 19, November, 2026 at the Boardroom
Documents (1)
- 00 11 16 - Advertisement for Bids.pdfapplication/pdf266 KBNot yet available
Contacts
Similar contracts
- The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: Replacement of seven 24-inch butterfly val…NCDue Dec 3, 2026
- All Materials must conform to OWASA Manual of Standards, Specifications, and Design, January 2025. • Actual bid shall include all required parts and pieces to create a fully functioning assembly in…NCDue Nov 10, 2026
- The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: Approximately 223 linear feet of 8-inch du…NCDue Nov 10, 2026
- The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: The project includes the replacement of ap…NCDue Oct 20, 2026
- Orange Water & Sewer Authority (hereinafter called “OWASA”) invites qualified web development firms to submit proposals for the rebuild of OWASA.org website. OWASA seeks a collaborative and innovat…NCDue Sep 9, 2026
- Paving Restoration ProjectNCDue Sep 1, 2026