nc_evp274-SM 2021-0027
Open
The Project consists generally of the following major items: • Removing the corrugated metal pipe portion of existing primary spillway, grout and seal off upstream portion of spillway, and demolish…
- Response deadline
- Nov 5, 2026 Due in 43 days
- Date posted
- Sep 22, 2026
- Source
- Open notice
Description
The Project consists generally of the following major items: • Removing the corrugated metal pipe portion of existing primary spillway, grout and seal off upstream portion of spillway, and demolish and remove existing riser. • Install cured-in-place pipe for reinforced concrete pipe portion of existing primary spillway for stormwater conveyance from existing catch basins on Richland Drive. • Removing the existing auxiliary weir and replacing with a weir with an overall length of 75 feet. • Construct headwall downstream of the cured-in-place pipe. • Place riprap and grouted riprap to tie in downstream grades and side embankments on downstream slope of Camp Pond Dam towards Richland Creek. • Place quarry stones in Richland Creek.
Documents (1)
- 00100 Advertisement for Bids_20220308 (2).pdfapplication/pdf87 KBNot yet available
Contacts
Similar contracts
- Rand Road Ten-Ten Road Water Main: Approximately 13,000 LF of 12-inch ductile iron pipe is to be installed within the right-ofway of Ten-Ten Road and Rand Road unless otherwise indicated. There wi…NCDue Sep 29, 2026
- Heavy Equipment Shop Overhead Door ReplacementNCDue Sep 23, 2026
- Galvanized Main Replacement Phase 2NCDue Sep 18, 2026
- The Transit Agencies are seeking proposals for a regional, account-based fare payment system that supports fixed-route and Bus Rapid Transit (BRT) services. The system shall provide mobile ticketin…NCDue Oct 2, 2026
- Complete professional janitorial services to the City’s customer-facing facilities at Dix Park. These locations include areas that are regularly frequented by park users. The City reserves the righ…NCDue Sep 8, 2026
- Existing landscape plants, pavement areas and a low retaining wall (less than 4' height) will be demolished and replaced with improvements. Plans include grading and drainage improvements, new land…NCDue Sep 15, 2026