Civic AI
Civic AI
Procurement intelligence
nc_evp274-PMP
Open

The Project consists generally of the following major items: · Installation and tie-in of approximately 2,140 LF of 30-inch ductile iron restrained joint water pipeline including fire hydrants and…

CITY OF RALEIGH / Little Creek Resource Recovery Facility Rehabilitation & Replacement Contract 2 · NC
Response deadline
Jul 16, 2026
Closed
Date posted
Jun 15, 2026

Description

The Project consists generally of the following major items: · Installation and tie-in of approximately 2,140 LF of 30-inch ductile iron restrained joint water pipeline including fire hydrants and other appurtenances · Installation and tie-in of approximately 1,410 LF of 24-inch ductile iron restrained joint water pipeline including fire hydrants and other appurtenances · One (1) 8-inch crossing to existing water main installed via jack & bore, with fire hydrant assembly · Demolition of an 8-in Pressure Reducing Valve and replacement with 12” DIP on Marshburn Road.

Documents (1)

  • 274-PMP Advertisement for Bids.pdf
    application/pdf61 KB
    Download

Contacts

  • Lanee Edwards

Explore more