nc_evp274-PR-PEDSTRUCTURES-2025
Open
The Project consists generally of the following major items: Base Bid - Structures #6 and #7 consist of replacing the existing timber structures with fiberglass structures. Alternate 1 - Structures…
- Response deadline
- Jun 17, 2026 Closed
- Date posted
- May 12, 2026
- Source
- Open notice
Description
The Project consists generally of the following major items: Base Bid - Structures #6 and #7 consist of replacing the existing timber structures with fiberglass structures. Alternate 1 - Structures #102 and #103 consists of replacing the existing timber decking with FRP. Alternate 2 - Structure #17 consists of replacing the existing timber structure with Timber Glu-lams and timber decking. Alternate 3 - Structure #17 consists of replacing the existing timber structure with steel framing and FRP decking