nc_evp345-08/07/2026
Open
The Cape Fear Public Utility Authority (CFPUA) is requesting Statements of Qualifications from engineering consulting firms with demonstrated expertise in the planning, design, permitting, implemen…
- Response deadline
- Sep 1, 2026 Due in 25 days
- Date posted
- Aug 7, 2026
- Source
- Open notice
Description
The Cape Fear Public Utility Authority (CFPUA) is requesting Statements of Qualifications from engineering consulting firms with demonstrated expertise in the planning, design, permitting, implementation, and construction support of innovative drinking water pilot treatment projects for the removal of 1,4 Dioxane.
Documents (1)
- RFQ -14 Dioxane Removal Pilot 2.0.pdfapplication/pdf244 KBNot yet available
Contacts
Similar contracts
- Cape Fear Public Utility Authority (CFPUA) requests statements of qualifications (SOQ) from consulting engineering firms for Water Supply Long Term Planning.NCDue Sep 10, 2026
- The Cape Fear Public Utility Authority (CFPUA) is seeking a qualified engineering consulting firm with demonstrated experience in the design, operation, testing, and evaluation of pilot-scale rever…NCDue Sep 8, 2026
- The Cape Fear Public Utility Authority (CFPUA) is seeking a qualified real property acquisition and appraisal firm experienced in working with North Carolina utilities. The successful firm will ass…NCDue Sep 15, 2026
- Cape Fear Public Utility Authority is accepting bids for the Northside WWTP Blower Replacement project. Scope of work includes replacing four existing blowers with four high speed turbo blowers wit…NCDue Sep 8, 2026
- The Cape Fear Public Utility Authority (CFPUA) is seeking an engineering firm experienced with survey, design, permitting and construction services for the Wrightsville Beach Waterline Replacement …NCDue Aug 27, 2026
- Cape Fear Public Utility Authority (CFPUA) desires to contract with a qualified engineering firm to provide Arc Flash Study associated with CFPUA Northside Water Reclamation Facility.NCDue Aug 25, 2026