Replace Roof and Gutters - BLRI
- Response deadline
- Jul 6, 2026 Closed
- Date posted
- Jun 5, 2026
- Source
- Open notice
Description
Provide the removal and replacement of roof and gutter systems for two houses, buildings B034 & B035 at Bluffs Housing: removal of approximately 36-Sq /3,600 -SF of asphalt shingles and replace with architectural 30 year shingles and #30 underlayment (note: underlayment can be replaced with synthetic underlayment), repair/replace damaged plywood sheeting/facia boards, replace drip edge, roof boots, install roof underlayment, installation of a ridge vent(s) along the length of the buildings, the removal and replacement of approximately 420-LF of gutter with downspouts and installation of approximately 270-LF of gutter guards on buildings. The buildings are a two-story residence with an asphalt shingle roof for Blue Ridge Parkway Laurel Springs, North Carolina.
Classifications
Documents (7)
- DownloadB08_Attachment_0005_Site_Visit_Information_140P5126Q0036.pdf.pdf105 KB
- DownloadB08_Attachment_0003_Bidsheet_140P5126Q0036_BLRI_R-G.pdf.pdf227 KB
- DownloadSol_140P5126Q0036.pdf.pdf820 KB
- DownloadB08_Attachment_0002_WDOL_WD_140P5126Q0036_BLRI_R-G.pdf.pdf1.5 MB
- DownloadA01_Attachment_0001_SOW_140P5126Q0036.pdf.pdf224 KB
- DownloadB08_Attachment_0004_Site_Specific_Safety_Plan_140P5126Q0036.pdf.pdf43 KB
- DownloadB08_Attachment_0006_PPQ_140P5126Q0036.pdf.pdf232 KB
Contacts
- edward_dingle@nps.gov4045075747
Similar contracts
- Roof Repairs - National Center for Cool and the Cold-Water Aquaculture (NCCCWA)West VirginiaDue Aug 17, 2026
- Air Traffic Control Tower & Base Building Waterproofing & Exterior Restoration ProjectFloridaDue Sep 8, 2026
- Roof Repair B9502 McGregor RangeTexasDue Aug 26, 2026
- Removal, Inspection, & Replacement Roofing - 3 remote Forest Service locationsArizonaDue Sep 10, 2026
- Free Quaker Meeting House, Roof Repair, ConservatiDue Sep 11, 2026
- Gold Beach Ranger Station Roof ReplacementsOregonDue Aug 28, 2026