nc_evpSCO-25-29437-01A
Open
Reed Gold Mine Panning Shelter This project consists of a new open-sided, pre-engineered wood shelter and adjacent storage shed on a concrete pad with a new sidewalk to tie into the existing sidew…
- Response deadline
- Jul 27, 2026 Closed
- Date posted
- Jul 10, 2026
- Source
- Open notice
Description
Reed Gold Mine Panning Shelter This project consists of a new open-sided, pre-engineered wood shelter and adjacent storage shed on a concrete pad with a new sidewalk to tie into the existing sidewalk on the property of the Reed Gold Mine in Midland, NC. Water is to be provided for owner’s panning trough system. Electrical panel is provided for future power needs. The project includes all other work as shown, indicated or reasonably implied on the drawings and/or specifications for a complete job.
Documents (1)
- SCO-25-29437-01A-NTB (Informal).pdfapplication/pdf207 KBNot yet available
Contacts
Similar contracts
- NCDOT SITE #571 BUNN FUEL TANK & FILLING ISLAND: This project consists of installation of a new fuel filling island with dispensers and accessories, two new gasoline aboveground fuel storage tanks …NCDue Dec 3, 2026
- Western North Carolina Veterans Cemetery -Phase 2 Repairs The basic project scope as described in the drawings and specifications shall include but is not limited to various work at the Chapel: rer…NCDue Nov 17, 2026
- Bentonville Battlefield State Historic Site - Maintenance FacilityNCDue Nov 17, 2026
- Cabarrus YDC BAS RenovationNCDue Nov 17, 2026
- NCCIW: Dormitories D, E, F & G Fire Alarm Replacement The existing conventional fire alarm systems in dormitories D, E, F, and G were installed in 1994 and are now obsolete. Because these systems h…NCDue Nov 19, 2026
- Jockey's Ridge State Park - Sand RelocationNCDue Nov 10, 2026