nc_evpSCO-25-29456-01A-1
Open
RE-BID for Southport & Fort Fisher Ferry Ramp Backup System. Scope of Work: The construction will include the installation of a chain hoist system to be used as a backup for the hydraulically ope…
- Response deadline
- Jul 16, 2026 Closed
- Date posted
- Jun 3, 2026
- Source
- Open notice
Description
RE-BID for Southport & Fort Fisher Ferry Ramp Backup System. Scope of Work: The construction will include the installation of a chain hoist system to be used as a backup for the hydraulically operated ferry ramp.
Documents (1)
- DownloadSCO -25-29456-01A-1.pdfapplication/pdf138 KB
Contacts
Similar contracts
- Elk Knob State Park – New Access AreasNCDue Sep 1, 2026
- Hammocks Beach State Park Cow Channel Dredging - RebidNCDue Aug 18, 2026
- Durham County Salt ShedNCDue Aug 24, 2026
- Renovations for Division 5 DMV in Fuquay-VarinaNCDue Aug 24, 2026
- ESTC Driving Track Rehabilitation-
General Scope: rehabilitation of existing training facility through Full Depth Reclamation, removing the existing full depth pavement section to subgrade, dispose…NCDue Aug 26, 2026
- Nature Research Center - Skyway Bridge HVACNCDue Sep 3, 2026