nc_evp367-OC5481(RB-1)
Open
Paving, Incidental Milling, Removing Asphalt/Tree Root, Pouring Ada Concrete Parking Spaces, Removing and Replacing Wooden Wheel Bump Stops, Installing Truncated Domes, Installing 15” Drainage Pipe…
- Response deadline
- May 19, 2026 Closed
- Date posted
- May 5, 2026
- Source
- Open notice
Description
PAVING, INCIDENTAL MILLING, REMOVING ASPHALT/TREE ROOT, POURING ADA CONCRETE PARKING SPACES, REMOVING AND REPLACING WOODEN WHEEL BUMP STOPS, INSTALLING TRUNCATED DOMES, INSTALLING 15” DRAINAGE PIPE, LAYING GRAVEL, INSTALLING SPEED TABLES, AND PARKING LOT RESTRIPING
Documents
No documents posted for this opportunity.