nc_evp294-29404222026
Open
Objective: Replace the existing storm water drainage pipes with new 36” High Density Polyethylene (HDPE) pipe and replace two drop inlets and one catch basin
- Response deadline
- May 21, 2026 Closed
- Date posted
- Apr 22, 2026
- Source
- Open notice
Description
Objective: Replace the existing storm water drainage pipes with new 36” High Density Polyethylene (HDPE) pipe and replace two drop inlets and one catch basin.
Documents
No documents posted for this opportunity.