Civic AI
Civic AI
Procurement intelligence
nc_evp294-29404222026
Open

Objective: Replace the existing storm water drainage pipes with new 36” High Density Polyethylene (HDPE) pipe and replace two drop inlets and one catch basin

Response deadline
May 21, 2026
Closed
Date posted
Apr 22, 2026

Description

Objective: Replace the existing storm water drainage pipes with new 36” High Density Polyethylene (HDPE) pipe and replace two drop inlets and one catch basin.

Documents

No documents posted for this opportunity.

Explore more