Civic AI
Civic AI
Procurement intelligence
nc_evp274-BMC
Open

Neuse River Resource Recovery Facility BNR Basins MCC Replacement: • Demolition and in-kind replacement of MCC-P4B, MCC-P5B, and MCC-P6B. • Demolition and replacement of PLC-81, PLC-82, and PLC-83…

Response deadline
Oct 21, 2026
Due in 35 days
Date posted
Sep 16, 2026

Description

Neuse River Resource Recovery Facility BNR Basins MCC Replacement: • Demolition and in-kind replacement of MCC-P4B, MCC-P5B, and MCC-P6B. • Demolition and replacement of PLC-81, PLC-82, and PLC-83 cabinets. • New prefabricated metal enclosure with walls, roof, doors, lighting, and HVAC system to house new MCC and PLC. • Extension of existing concrete foundation to accommodate new enclosure footprint. • Demolition and replacement of all power wire cable within existing conduit from each MCC to each motor and device on BNR Aeration Basins 1-6. • Demolition and replacement of sections of corroded electrical conduit from each MCC to each motor and device on BNR Aeration Basins 1-6.

Documents (1)

  • 274-BMC.pdf
    application/pdf65 KBNot yet available

Contacts

Similar contracts

Explore more