SAM.govN4008526R9049
Open
Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning
DEPT OF DEFENSE · NC
- Response deadline
- Aug 5, 2026 Closed
- Date posted
- Jul 6, 2026
- Source
- Open notice
Description
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
Classifications
Documents (5)
- Download26M086CN Multiple BEQ HVAC Chiller Loop Flushing PD.pdf.pdf181 KB
- DownloadCombined DIV 01 DBB specs.pdf.pdf560 KB
- DownloadRFP 260431.pdf.pdf109 KB
- Download26M086CN Multiple BEQ HVAC Chiller Loop Flushing SOW.pdf.pdf90 KB
- DownloadContractor Environmental Guide Updated Format_20231009 with ESOP.pdf.pdf4.5 MB
Contacts
Similar contracts
- FRC Ground Level HVAC and Roof ReplacementTexasDue Sep 9, 2026
- 573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMCFloridaDue Sep 9, 2026
- Replacement of Conference Room, and Command Suite WindowsAlaskaDue Sep 9, 2026
- FCI Seagoville Hot Water Generator ReplacementTexasDue Sep 16, 2026
- MAHG 17-1095 Stennis HallMississippiDue Sep 9, 2026
- Z--DENA 332037 Eielson Roof ReplacementDue Oct 1, 2026