Little Creek Resource Recovery Facility Rehabilitation & Replacement Contract 2: Replacement of disc aerators and drive, valves, gates, denitrification pump and guiderails, in oxidation ditch. Rep…
- Response deadline
- Aug 4, 2026 Closed
- Date posted
- Jun 15, 2026
- Source
- Open notice
Description
Little Creek Resource Recovery Facility Rehabilitation & Replacement Contract 2: Replacement of disc aerators and drive, valves, gates, denitrification pump and guiderails, in oxidation ditch. Replacement of aerator for jet mixing system in waste sludge day tank and replacement in-kind of existing sludge pump. Installation of new sludge piping to connect waste sludge day tank to truck loadout. Replacement of chem feed and storage including both bulk storage tanks and piping, recirculation pump, chemical metering pumps, new eyewash station and associated tepid water piping with instantaneous water heater. Installation of jet aeration system, associated piping and pumps, blowers, in Equalization Tank No. 1. Installation of mixed liquor and RAS piping to connect Equalization Tank No. 1 to the clarifier distribution box. Installation of drain lines from both secondary clarifiers to drain line to headworks. Installation of precast meter vault on WAS line, installation of new electrically actuated valves on WAS line. Demolition of electrical equipment in operations building electrical room and installation of pre-cast concrete electrical building, new transformer. Associated ductbank for new equipment. Associated instrumentation for new equipment.
Documents (3)
- Addendum No. 1_Bid Date Update.pdfapplication/pdf536 KBNot yet available
- Download274-RRC2.pdfapplication/pdf1.1 MB
- Addendum No. 1.pdfapplication/pdf536 KBNot yet available
Contacts
Similar contracts
- Rand Road Ten-Ten Road Water Main: Approximately 13,000 LF of 12-inch ductile iron pipe is to be installed within the right-ofway of Ten-Ten Road and Rand Road unless otherwise indicated. There wi…NCDue Sep 29, 2026
- Heavy Equipment Shop Overhead Door ReplacementNCDue Sep 23, 2026
- Galvanized Main Replacement Phase 2NCDue Sep 18, 2026
- The Transit Agencies are seeking proposals for a regional, account-based fare payment system that supports fixed-route and Bus Rapid Transit (BRT) services. The system shall provide mobile ticketin…NCDue Oct 2, 2026
- Complete professional janitorial services to the City’s customer-facing facilities at Dix Park. These locations include areas that are regularly frequented by park users. The City reserves the righ…NCDue Sep 8, 2026
- Existing landscape plants, pavement areas and a low retaining wall (less than 4' height) will be demolished and replaced with improvements. Plans include grading and drainage improvements, new land…NCDue Sep 15, 2026