nc_evp294-294-09282026
Open
Installation of approximately a total of 40 feet of 8-inch PVC SDR35 Gravity Sewer Pipe, remove the two old manhole structures, and install two new manhole structures
- Response deadline
- Oct 28, 2026 Due in 30 days
- Date posted
- Sep 28, 2026
- Source
- Open notice
Description
Installation of approximately a total of 40 feet of 8-inch PVC SDR35 Gravity Sewer Pipe, remove the two old manhole structures, and install two new manhole structures.
Documents (1)
- 2026 Installation of SDR35 PVC Gravity Sewer Pipe and Replacement of Two Manholes Daniels Ct.pdfapplication/pdf1.7 MBNot yet available
Contacts
Similar contracts
- Objective: Trenchless repair of gravity sewer line sections Nunn Street near the address of house 413 Forest Hill Drive and the intersection at McCotter Boulevard, between manholes TH32 to TH33, s…NCDue Oct 7, 2026
- Asphalt parking lot/stone parking lot installation at the Parks and Recreation Center adding a lot north and east of the existing parking lot to create additional parking and resurfacing the existi…NCDue Aug 28, 2026
- Address Bids to: Kimberly Walters, Finance Director City of Havelock P.O. Box 368 1 Governmental Ave. Havelock, NC 28532 Fax: 252-447-0126 Email: Bids@havelocknc.usNCDue Aug 27, 2026