SAM.gov01-FBNCClosedLoopsFollow-onFY26
Open
Fort Bragg NC Closed Loops Follow-on FY26
DEPT OF DEFENSE · NC
- Response deadline
- Jul 30, 2026 Closed
- Date posted
- Jul 14, 2026
- Source
- Open notice
Description
MICC-FB received a request for Chemical Testing and Treatment for the Closed Loop & Open Recirculation Tower Systems (HVAC) at Fort Bragg, North Carolina to include Pope Army Airfield, Camp Mackall, Simmons Army Airfield, Airborne Special Operations Museum and Linden Oaks. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform water treatment services and testing for all Water Systems (HVAC).
Classifications
Documents (2)
- SOURCES SOUGHT SYNOPSIS Water Treatment 20180629.pdf.pdf128 KBNot yet available
- PWS (DRAFT) Closed Loops Follow-on FY26_PWS_06172026.docx.docx202 KBNot yet available
Contacts
- alfred.r.sebile.civ@army.mil910-643-3702
- katie.e.derra.civ@army.mil910-907-5121
Similar contracts
- Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228IllinoisDue Oct 20, 2026
- TVHS AC VRF System InstallationTennesseeDue Oct 23, 2026
- Troubleshoot & Repair of Portable Chillers Service RequirementTexasDue Oct 22, 2026
- Cooling Water System Repair and Reliability ProjectDue Oct 26, 2026
- FY 2026 Preventive Maintenance Services to the Building Automation SystemEstuaireDue Oct 19, 2026
- Trane BAS HVAC Control System Inspection, Maintenance, Upgrades, and RepairWYDue Oct 28, 2026