nc_evpSCO-25-30270-01A
Open
ESTC Driving Track Rehabilitation- General Scope: rehabilitation of existing training facility through Full Depth Reclamation, removing the existing full depth pavement section to subgrade, dispose…
- Response deadline
- Aug 26, 2026 Closed
- Date posted
- Aug 4, 2026
- Source
- Open notice
Description
ESTC Driving Track Rehabilitation- General Scope: rehabilitation of existing training facility through Full Depth Reclamation, removing the existing full depth pavement section to subgrade, dispose of existing asphalt in accordance with local and State regulations, replace it with a new full depth pavement section in select areas, restripe existing FAA and training markings.
Documents (1)
- SCO-25-30270-01A-NTB.pdfapplication/pdf165 KBNot yet available
Contacts
Similar contracts
- NCDOT SITE #571 BUNN FUEL TANK & FILLING ISLAND: This project consists of installation of a new fuel filling island with dispensers and accessories, two new gasoline aboveground fuel storage tanks …NCDue Dec 3, 2026
- Western North Carolina Veterans Cemetery -Phase 2 Repairs The basic project scope as described in the drawings and specifications shall include but is not limited to various work at the Chapel: rer…NCDue Nov 17, 2026
- Bentonville Battlefield State Historic Site - Maintenance FacilityNCDue Nov 17, 2026
- Cabarrus YDC BAS RenovationNCDue Nov 17, 2026
- NCCIW: Dormitories D, E, F & G Fire Alarm Replacement The existing conventional fire alarm systems in dormitories D, E, F, and G were installed in 1994 and are now obsolete. Because these systems h…NCDue Nov 19, 2026
- Jockey's Ridge State Park - Sand RelocationNCDue Nov 10, 2026