nc_evp274-EMJ-OZGEN
Open
E.M. Johnson Water Treatment Plant Ozone Upgrades: The Project consists generally of the following major items: • Replacement of one existing Ozone Generator and Power Supply Unit (PSU) • Modifica…
CITY OF RALEIGH / Little Creek Resource Recovery Facility Rehabilitation & Replacement Contract 2 · NC
- Response deadline
- Jul 14, 2026 Closed
- Date posted
- Jun 9, 2026
- Source
- Open notice
Description
E.M. Johnson Water Treatment Plant Ozone Upgrades: The Project consists generally of the following major items: • Replacement of one existing Ozone Generator and Power Supply Unit (PSU) • Modification to existing cooling water piping • Miscellaneous electrical modifications and integration of this equipment into the existing facility control system
Documents (2)
Contacts
- Lanee Edwards