SAM.govN4008526R9054
Open
BEQ M400 Area Paint-Flooring Repairs
DEPT OF DEFENSE · NC
- Response deadline
- Aug 6, 2026 Closed
- Date posted
- Jul 21, 2026
- Source
- Open notice
Description
Only General MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
Classifications
Documents (13)
- 09 65 00 RESILIENT FLOORING SPECS.pdf.pdf27 KBNot yet available
- Amen 02.pdf.pdf101 KBNot yet available
- 09 68 00 CARPETING SPECS.pdf.pdf67 KBNot yet available
- BEQ M446-M447-M448 FLRPLN.pdf.pdf1.3 MBNot yet available
- 26M087CN BEQ M400 Area Paint-Flooring Project SOW.pdf.pdf154 KBNot yet available
- BEQ M430 FLRPLN.pdf.pdf4.3 MBNot yet available
- Contractor Environmental Guide.pdf.pdf4.5 MBNot yet available
- Site Visit Roster.pdf.pdf152 KBNot yet available
- Combined DIV 01 DBB SPECS.pdf.pdf555 KBNot yet available
- BEQ M435 FLRPLN.pdf.pdf1.5 MBNot yet available
- 09 90 00 PAINTS COATINGS Spec..pdf.pdf220 KBNot yet available
- Amend 01 Site Visit.pdf.pdf178 KBNot yet available
- RFP 260433.pdf.pdf195 KBNot yet available
Contacts
Similar contracts
- 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221OklahomaDue Oct 30, 2026
- Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)Due Oct 5, 2026
- PLA Survey for Human Performance Wig Lab at WPAFBOhioDue Oct 7, 2026
- HST Roof Safety Construction ProjectDistrict of ColumbiaDue Oct 19, 2026
- Construct US Space Force Integration Facility, F/10852 Wpafb, OhioOhioDue Oct 6, 2026
- Fort Lee Vehicle Recovery RangeVirginiaDue Oct 13, 2026