SAM.gov36C24226Q0349
Open
Installation of OR and Prosthetics Automatic Door Closures
- Response deadline
- May 4, 2026 Closed
- Date posted
- Apr 30, 2026
- Source
- Open notice
Similar contracts
- Elevator Equipment and Systems Recurring Preventative Maintenance and Non-Wear-and-Tear RepairsDue Nov 2, 2026
- Modernize Damen (Bldg. 1) Elevators Construction 537-24-101IllinoisDue Nov 19, 2026
- Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CTConnecticutDue Nov 5, 2026
- Johnston Ridge Observatory Backup Generator Repairs Gifford Pinchot National ForestWashingtonDue Nov 3, 2026
- Elevator Control System Modernization – FCC Yazoo City (Low II)MississippiDue Nov 6, 2026
- 537-26-101 Construction of Ogden Elevator Cab Interiors Jesse Brown VA Medical CenterILDue Dec 4, 2026