SAM.gov140P8326Q0055
Open
N--MORA-PARADISE FIBER INSTALL
- Response deadline
- Aug 17, 2026 Due in 3 days
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
The purpose of this Amendment 0001 is to: 1. Add mandatory FAR Clause 52.219-14 Limitations on Subcontracting by reference. By direction of the Contracting Officer, no other changes have been made.
Classifications
Documents (9)
- Sol_140P8326Q0055_Amd_0001.pdf.pdf201 KBNot yet available
- Sol_140P8326Q0055.pdf.pdf280 KBNot yet available
- Attachment_1_READ_ME_FIRST_-_FAQs_3pgs.pdf.pdf195 KBNot yet available
- Attachment_5_Forms_to_Return_with_Quote_8pgs.docx.docx36 KBNot yet available
- Attachment_7_SIte_Visit_Location_Details_MORA_Paradise_Fiber_Install_2pgs.docx.docx1.7 MBNot yet available
- Attachment_4_SOW_MORA_Paradise_Fiber_Install_39pgs.pdf.pdf514 KBNot yet available
- Attachment_3_Wage_Determination_Lewis_Washington_MORA_Paradise_Fiber_Optic_Install_9pgs.pdf.pdf2.8 MBNot yet available
- Attachment_6_SOW_Appendix_A_5pgs.pdf.pdf2.5 MBNot yet available
- Attachment_2_Simplified_Construction_Terms_Provisions_Clauses_34pgs.pdf.pdf541 KBNot yet available
Contacts
- michael_abner@ios.doi.gov0000000000
Similar contracts
- B118 Fire PanelOhioDue Sep 3, 2026
- Z1DA--460-26-007 | Electrical Distribution Inspection Repairs | NCO 4 Construction East (VA-26-00057558)Due Aug 19, 2026
- POWER SYSTEM GENERATOR & TRANSFER SWITCHES REPLACEDue Aug 28, 2026
- Removal and Replacement of Dishwasher BLDG 20226TexasDue Aug 26, 2026
- Ft. Leavenworth Fire Alarm and Mass Notification System Upgrade, $45M, 5 Year SATOCDue Sep 15, 2026
- Dishwasher Replacement B20626TexasDue Aug 26, 2026