bidxSTPB 9004(23)
Open
Stpb 9004(23)
- Response deadline
- Dec 3, 2026 Due in 28 days
- Date posted
- Nov 5, 2026
- Source
- Open notice
Description
The Bridge Removal ? W of Toston project includes the removal of an off-system bridge (NBI Structure ID L04415000+01001), over the Missouri River near Toston in Broadwater County. The bridge is currently closed to traffic. The work will take place between RP 0.05 and RP 0.2 on the Highway 287 Bypass. Pier removal and barricade installation will be included with the project. Counties: Broadwater Eligibility: Eligible
Documents
No documents posted for this opportunity.
Similar contracts
- Stpp-Nh Stwd(635)MTDue Dec 3, 2026
- Stps 246-1(13)7MTDue Dec 3, 2026
- IM 90-7(121)360MTDue Dec 3, 2026
- NH 11-1(105)0MTDue Dec 3, 2026
- Stps 345-1(20)0MTDue Dec 3, 2026
- Stpp 78-2(39)29MTDue Dec 3, 2026