bidxSTPB 81014(2)0
Open
STPB 81014(2)0
- Response deadline
- Sep 9, 2026 Due in 21 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
The Greycliff Area Bridges Design Build project is Preliminary Engineering, Construction, Construction Engineering, Incidental Construction, and Right-of- Way activities required for the bridge replacement of 6 structures between Greycliff and Big Timber. This project is located in Sweet Grass County on State Highway 81014 from reference point 2.4 to 7.0. Counties: Sweet Grass Eligibility: Eligible
Documents
No documents posted for this opportunity.