MT PRAIRIE 2016(3), Milwaukee Bridge Resurfacing and Rehabilitation
- Response deadline
- Aug 4, 2026 Closed
- Date posted
- Jul 23, 2026
- Source
- Open notice
Description
Update 07/23/2026: QandA_07-22-2026.pdf posted to attachments Update 07/21/2026: QandA_07-21-2026.pdf posted to attachments Update 07/21/2026: QandA_07-20-2026.pdf posted to attachments Update 07/20/2026: Amendment A002.pdf posted to attachments Update 07/17/2026: QandA_07-17-2026.pdf posted to attachments Update 07/17/2026: QandA_07-16-2026.pdf posted to attachments Update 07/13/2026: QandA_07-13-2026.pdf posted to attachments Update 07/10/2026: Amendment A001.pdf posted to attachments Update 07/07/2026: QandA_07-07-2026.pdf posted to attachments Update 07/02/2026: QandA_07-02-2026.pdf posted to attachments Solicitation for contruction project, MT PRAIRIE 2016(3), Milwaukee Bridge Resurfacing and Replacement The Invitation for Bid (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.101-4 are posted under attachments.
Classifications
Documents (14)
- Physical Data_mta-prairie2016-3.zip.zip18.7 MBNot yet available
- QandA_07-16-2026.pdf.pdf274 KBNot yet available
- Link to Virtual Bid OpeningNot yet available
- QandA_07-20-2026.pdf.pdf282 KBNot yet available
- Amendment A002.pdf.pdf1.6 MBNot yet available
- QandA_07-07-2026.pdf.pdf221 KBNot yet available
- QandA_07-13-2026.pdf.pdf278 KBNot yet available
- QandA_07-22-2026.pdf.pdf318 KBNot yet available
- Amendment A001.pdf.pdf382 KBNot yet available
- QandA_07-02-2026.pdf.pdf127 KBNot yet available
- mta-prairie2016-3_plans_IFB.pdf.pdf13.9 MBNot yet available
- QandA_07-21-2026.pdf.pdf288 KBNot yet available
- QandA_07-17-2026.pdf.pdf278 KBNot yet available
- IFB_69056726B000003.pdf.pdf6.2 MBNot yet available
Contacts
- wfl.contracts@dot.gov3606197520
Similar contracts
- Notice of Intent (NOI) to Sole Source for SAFB Taxiway Repairs at SAFB, ILIllinoisDue Oct 14, 2026
- CO NP BLCA 10(1) South Rim DriveColoradoDue Oct 8, 2026
- Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest ServiceNew MexicoDue Oct 22, 2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementOregonDue Oct 8, 2026
- Sidewalk Replacement Throughout Lyons CampusDue Oct 9, 2026
- Airfield Civil Works IDIQDue Oct 5, 2026