Civic AI
Civic AI
Procurement intelligence
SAM.govFA4626-26-R-0008
Open

Horizontal Construction Multiple Award Contract (MAC)

DEPT OF DEFENSE · MT
Response deadline
Jul 30, 2026
Due in 13 days
Date posted
Jul 9, 2026

Description

This requirement is for the Horizontal Construction Multiple Award Contract (MAC) at Malmstrom AFB, MT. The Horizontal Construction MAC will be used to satisfy a multitude of horizontal construction projects in support of the Malmstrom AFB installation and its missile alert/launch facilities. Projects issued under the Horizontal Construction MAC shall fall under the 237990 NAICS code with a small business size standard of $45,000,000.00 There will be an initial five (5) year ordering period with a two (2) year optional ordering period. The total aggregate maximum amount expendable under the entire Horizontal Construction MAC lifecycle SHALL NOT EXCEED $25,000,000.00. The guaranteed minimum amount over the life of this contract is $500.00. The awardees guaranteed minimum will be satisfied by attendance to the Post-Award Conference. SEED PROJECT: The initial project to be awarded under the Horizontal Construction MAC will be the "Repair North/South Base Water System, Phase 2". Project Site Visit: A site visit will be held on 09 July 2026 at 9:00 am MDT in the 341st Contracting Squadron Auditorium (located at 7015 Goddard Drive, Bldg. 145, Malmstrom AFB, MT, 59402). All interested parties must be able to access a federal installation in order to attend the site visit. If you do not currently have the ability to access to a federal installation, please fill out, sign, and submit a Contractor Entry Authorization List (CEAL) to the contracting personnel identified in Box 7 no later than 01 July 2026. Notice to Offerors/Suppliers: Funds are not presently available for this effort. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

Classifications

Documents (13)

  • 5_WD MT20260066 (17May26).pdf
    .pdf338 KB
    Download
  • 7_Past Performance Reference Sheet.pdf
    .pdf313 KB
    Download
  • Pre-Proposal Site Visit Sign-In_09Jul26.pdf
    .pdf194 KB
    Download
  • 4_RPR North-South Water Bid Schedule.xlsx
    .xlsx17 KB
    Download
  • 9_Horizontal Construction MAC Off-On Ramp Procedures.pdf
    .pdf128 KB
    Download
  • 11_CEAL.xlsx
    .xlsx76 KB
    Download
  • 10_Subcontractor Consent.pdf
    .pdf97 KB
    Download
  • 1_Specifications combined.pdf
    .pdf5.3 MB
    Download
  • 8_Horizontal Construction MAC Ordering Guide.pdf
    .pdf148 KB
    Download
  • 2_Drawings.pdf
    .pdf6.7 MB
    Download
  • Solicitation - FA462626R0008.pdf
    .pdf765 KB
    Download
  • 3_Submittal Schedule - North South Base Water.xlsx
    .xlsx21 KB
    Download
  • 6_Horizontal Construction MAC Section L and M.pdf
    .pdf279 KB
    Download

Contacts

Explore more