Horizontal Construction Multiple Award Contract (MAC)
- Response deadline
- Jul 30, 2026 Closed
- Date posted
- Jun 18, 2026
- Source
- Open notice
Description
This requirement is for the Horizontal Construction Multiple Award Contract (MAC) at Malmstrom AFB, MT. The Horizontal Construction MAC will be used to satisfy a multitude of horizontal construction projects in support of the Malmstrom AFB installation and its missile alert/launch facilities. Projects issued under the Horizontal Construction MAC shall fall under the 237990 NAICS code with a small business size standard of $45,000,000.00 There will be an initial five (5) year ordering period with a two (2) year optional ordering period. The total aggregate maximum amount expendable under the entire Horizontal Construction MAC lifecycle SHALL NOT EXCEED $25,000,000.00. The guaranteed minimum amount over the life of this contract is $500.00. The awardees guaranteed minimum will be satisfied by attendance to the Post-Award Conference. SEED PROJECT: The initial project to be awarded under the Horizontal Construction MAC will be the "Repair North/South Base Water System, Phase 2". Project Site Visit: A site visit will be held on 09 July 2026 at 9:00 am MDT in the 341st Contracting Squadron Auditorium (located at 7015 Goddard Drive, Bldg. 145, Malmstrom AFB, MT, 59402). All interested parties must be able to access a federal installation in order to attend the site visit. If you do not currently have the ability to access to a federal installation, please fill out, sign, and submit a Contractor Entry Authorization List (CEAL) to the contracting personnel identified in Box 7 no later than 01 July 2026. Notice to Offerors/Suppliers: Funds are not presently available for this effort. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
Classifications
Documents (12)
- Download5_WD MT20260066 (17May26).pdf.pdf338 KB
- Download7_Past Performance Reference Sheet.pdf.pdf313 KB
- Download4_RPR North-South Water Bid Schedule.xlsx.xlsx17 KB
- Download9_Horizontal Construction MAC Off-On Ramp Procedures.pdf.pdf128 KB
- Download11_CEAL.xlsx.xlsx76 KB
- Download10_Subcontractor Consent.pdf.pdf97 KB
- Download1_Specifications combined.pdf.pdf5.3 MB
- Download8_Horizontal Construction MAC Ordering Guide.pdf.pdf148 KB
- Download2_Drawings.pdf.pdf6.7 MB
- DownloadSolicitation - FA462626R0008.pdf.pdf765 KB
- Download3_Submittal Schedule - North South Base Water.xlsx.xlsx21 KB
- Download6_Horizontal Construction MAC Section L and M.pdf.pdf279 KB
Contacts
- cody.babinecz@us.af.mil4067314608
- branden.lawson@us.af.mil4067314353
Similar contracts
- LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)LouisianaDue Oct 27, 2026
- Industry Day - Selma AL Flood Management Risk and BankAlabamaDue Oct 28, 2026
- Section 219 Chesterton Interceptor Rehab
- Camp Wooten/Starbuck Levee RehabWashingtonDue Oct 30, 2026
- Sources Sought: Liberty State Park Ecosystem Restoration Project, Jersey City, NJNew JerseyDue Oct 30, 2026
- Sources Sought Wood River Relief Wells ConstructionDue Oct 28, 2026