SAM.gov1240LU26Q0107
Open
HELENA NATIONAL FOREST - Solar System Install on Existing Well
- Response deadline
- Aug 6, 2026 Closed
- Date posted
- Jul 16, 2026
- Source
- Open notice
Description
Z- Solar System Install on Existing Well - Helena Lewis & Clark NF See attachment section for all the details in the 8 documents. Period of Performance: 9/1/26 to 10/30/2026
Classifications
Documents (9)
- Attachment1 - StmtOfWork.pdf.pdf244 KBNot yet available
- Attachment4 -TankSpecs - 8x8 Storage Tank Drinker.pdf.pdf401 KBNot yet available
- Attachment2 - Specification_Exhibits.pdf.pdf1.2 MBNot yet available
- 1240LU26Q0107.pdf.pdf688 KBNot yet available
- Attachment3 - MagpieWellLocation.pdf.pdf1.2 MBNot yet available
- Attachment7 - ShepsHightlifterRoadsFSMap.pdf.pdf1.0 MBNot yet available
- Attachment5 - MagpieWellTopo.pdf.pdf882 KBNot yet available
- Attachment6 - ShepsHightlifterCoversionTopo.pdf.pdf1.1 MBNot yet available
- Attachment8 - DB WageRates.pdf.pdf176 KBNot yet available
Contacts
- lisa.rakich@usda.gov4064910561
- tracy.schilling@usda.gov4064396219
Similar contracts
- Replace 32 Exhaust Fans, Poplarville, MississippiMississippiDue Sep 9, 2026
- Supply and Install Greenhouse Evaporative Cooling System, Stoneville, MississippiMississippiDue Sep 15, 2026
- FY26 NRM - Install Analog Phone Line to Building 6 - 610A4-26-510IndianaDue Sep 10, 2026
- Replacement of the Outdated Fire Alarm System, Curtius Annex, U.S. Embassy Berlin, GermanyBerlinDue Sep 21, 2026
- N--Ak-Kenai Nwr-Audiovisual RepairDue Sep 21, 2026
- H--Cuga- Upgrade Wr Campground ElectricalDue Sep 21, 2026