Civic AI
Civic AI
Procurement intelligence
SAM.gov47PD5526R0039
Open

Crawlspace Water Mitigation - Piegan LPOE-Babb

GENERAL SERVICES ADMINISTRATION · MT
Response deadline
Jul 10, 2026
Closed
Date posted
Jun 18, 2026

Description

The Piegan LPOE Port has water accumulation under the main port building that needs to be mitigated. This will be accomplished by the installation of French drain system around the perimeter of the building foundation footings. French drains once installed will empty into contractor supplied sump pumps to collect water to be pumped out into the storm drain system. A new vapor barrier will be installed to damper any ground source water evaporation from occurring under the building.

Classifications

Documents

No documents posted for this opportunity.

Contacts

Explore more