Combined Project-Billings Cellblock refresh, Bozeman Wall addition, Bozeman Freezer HVAC
- Response deadline
- May 7, 2026 Closed
- Date posted
- Apr 23, 2026
- Source
- Open notice
Description
Billings USMS - Cellblock Refresh Stainless Steel Restoration: Remove scratches from stainless steel benches and walls in: Contractor/USMS/GSA walk-through required to verify exact damage locations Painting Bozeman FSA - Office Build-Out Build new wall with metal studs Install door and frame to match existing (type, size, color) Extend wall to deck above Install matching baseboard on new wall Add electrical receptacles if required by code Repair/replace carpet as needed Paint entire room with low VOC paint to match existingRepair affected ceiling grid Relocate fire sprinklers per code Move HVAC ceiling penetrations as needed Bozeman FWS - Freezer HVAC Install heat removal system for ultra-low temperature freezers Maintain room temperature between 64.4�F to 89.6�F per equipment specifications Solution Options: New exhaust system with fresh air supply duct, OR Ductless split-system AC unit with fresh air supply Contractor to investigate and propose solution with pricing GENERAL REQUIREMENTS Provide all labor, materials, equipment, and supervision Comply with all applicable codes and standards Submit detailed cost breakdown and proposed solutions Maintain OSHA and GSA safety standards Coordinate access during business hours HSPD-12 badge required
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Fy27 MaccSouth CarolinaDue Nov 4, 2026
- JB Charleston Multiple Award Construction ContractSouth CarolinaDue Nov 2, 2026
- Saber Fy 27-32Due Nov 6, 2026
- (EAR048) Repair Fire Alarm System Eareckson Air Station FacilitiesAlaskaDue Nov 16, 2026
- 122FW - Fort Wayne, IN - Munitions Storage Area Construction
- 590-27-120 Replace Pneumatic Tube SystemVirginiaDue Dec 16, 2026