MSD Infrastructure Repairs Phase 2
- Response deadline
- Sep 24, 2026 Closed
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
The U. S. Army Corps of Engineers, St. Louis District proposes to provide Federal construction assistance to Metropolitan St. Louis Sewer District for the rehabilitation of combined sewers. The subject project consists of sewer rehabilitation utilizing Cured-In-Place Pipe (CIPP) methods. The rehabilitation work is generally described within of the Metropolitan St. Louis Sewer District specifications as follows: The work will consist of furnishing all labor, equipment, operators, supervision, supplies and materials, and incidentals necessary to perform sewer rehabilitation of approximately 2,675 lineal feet of sewers, sized at 21 inches in diameter to 24 inches in diameter utilizing CIPP methods. The project is within the MSD Boundaries, which includes the City of St. Louis and St. Louis County, Missouri. The work will be performed in various quantities at various sites. The initial work identified is in MSDs Service Area 1. Refer to W912P926BA008 for Pre-Solicitation Notice.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- 658-23-108 Correct Stormwater DrainageVirginiaDue Nov 10, 2026
- 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, WyomingWyomingDue Nov 4, 2026
- Loleta Water System UpgradesPennsylvaniaDue Oct 26, 2026
- Kelly Pierson OSSWashingtonDue Oct 28, 2026
- Well Replacement at Lac Qui Parle Project shop siteDue Oct 22, 2026
- 9-Mile Pump StationDue Oct 20, 2026