MSD Infrastructure Repairs Phase 2
- Response deadline
- —
- Date posted
- Jun 23, 2026
- Source
- Open notice
Description
The U. S. Army Corps of Engineers, St. Louis District proposes to provide Federal construction assistance to Metropolitan St. Louis Sewer District for the rehabilitation of combined sewers. The subject project consists of sewer rehabilitation utilizing Cured-In-Place Pipe (CIPP) methods. The rehabilitation work is generally described within of the Metropolitan St. Louis Sewer District specifications as follows: The work will consist of furnishing all labor, equipment, operators, supervision, supplies and materials, and incidentals necessary to perform sewer rehabilitation of approximately 2,675 lineal feet of sewers, sized at 21 inches in diameter to 24 inches in diameter utilizing CIPP methods. The project is within the MSD Boundaries, which includes the City of St. Louis and St. Louis County, Missouri. The work will be performed in various quantities at various sites. The initial work identified is in MSDs Service Area 1.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Install Sewer Lift Station Pumps and Controls, Stoneville, MississippiMississippiDue Sep 15, 2026
- NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American LakeDue Sep 11, 2026
- Yellowstone - Mammoth Water Line ReplacementDue Sep 15, 2026
- Y--2026 Marcott Coulee PipelineDue Sep 10, 2026
- MAHG251029 Repair Water Tower #8MississippiDue Sep 15, 2026
- Norwood Horse Pasture WellColoradoDue Sep 22, 2026