Repair Water Tower #8
- Response deadline
- Jul 17, 2026 Closed
- Date posted
- Jul 14, 2026
- Source
- Open notice
Description
Keesler AFB, MS has an upcoming requirement for paint and repairs to Water Tower #8. The general scope includes, but is not limited to, the inspection and repairs of the water tower and components, repairs of failing drain lines, disinfection of the tower tank, interior and exterior painting, and repairs to the existing safety climbing devices. The required end state is a fully operational water tower that is in compliance with all AWWA, OSHA, and UFC standards. The anticipated period of performance is 90 calendar days beginning 10 days after contract award. Please note: this is a sources sought notice for market research purposes only. This is not a formal solicitation. A solicitation will be posted on SAM.gov at a later date. If your firm is capable and interested in this requirement, please let us know by emailing TSgt Taylor Williams, taylor.williams.26@us.af.mil, and Alice Townsend-Peden, alice.townsend-peden@us.af.mil, with the following: A brief statement of your capability to perform this work. 1. Your company's CAGE code, UEI, and business size/socioeconomic status. 2. Any standard spec sheets or brochures for the systems you might propose.
Classifications
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- Install Sewer Lift Station Pumps and Controls, Stoneville, MississippiMississippiDue Sep 15, 2026
- NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American LakeDue Sep 11, 2026
- Yellowstone - Mammoth Water Line ReplacementDue Sep 15, 2026
- Y--2026 Marcott Coulee PipelineDue Sep 10, 2026
- MAHG251029 Repair Water Tower #8MississippiDue Sep 15, 2026
- Norwood Horse Pasture WellColoradoDue Sep 22, 2026