Civic AI
Civic AI
Procurement intelligence
SAM.gov36C25626Q0968
Open

J023--Van lift Gate Installation

VETERANS AFFAIRS, DEPARTMENT OF · MS
Response deadline
Jun 29, 2026
Closed
Date posted
Jun 24, 2026

Description

Scope of Work (SOW) Lift Gate Installation for Sprinter Van Project Overview: The contractor shall provide all labor, materials, supervision, transportation, and equipment necessary to supply and install one (1) new 1,100-lb capacity hydraulic lift gate onto the designated Sprinter van. The installation must be conducted in accordance with all manufacturer specifications, safety standards, and applicable federal, state, and local regulations. Technical Requirements: Provide and install one (1) new rear-mounted hydraulic lift gate assembly. Minimum load capacity: 1,100 pounds. Lift gate must be compatible with the existing Sprinter van make and model. Provide all required hardware, wiring, brackets, hydraulic components, and fasteners. All electrical work shall comply with vehicle manufacturer guidelines and safety standards. Lift gate shall include corrosion-resistant materials suitable for coastal climates. Upon completion, perform full operational testing, safety verification, and functional load testing.

Classifications

Documents (1)

Contacts

Explore more