Deer Island Ecosystem Restoration, Phase 1 Deer Island, MS (Harrison County)
- Response deadline
- Jul 9, 2026 Closed
- Date posted
- Jun 30, 2026
- Source
- Open notice
Description
Phase 1 Breakwater. This contract involves constructing the initial phase for the restoration of Deer Island, specifically restoring the extension of the rock breakwater structure known as Katrina Key, approximately 12,000 feet, to soften the effects of normal wave erosion. This restoration includes placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850’s dimensions. Offerors are hereby advised that all references to the FAR and DFARS within this solicitation pertain to the new Revolutionary FAR Overhaul (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide). While much of the verbiage has remained consistent with the previous version of the FAR and DFARS, there are notable differences. It is incumbent upon the contractor to be fully aware of these changes and ensure their proposal complies accordingly. 5/28/2026: AM0001 posted to PIEE 6/26/2026: AM0002 posted to PIEE 6/30/2026: AM0003 posted to PIEE
Classifications
Documents (4)
- Web Based Training for the PIEE Solicitation ModuleNot yet available
- Department of Defense Procurement ToolboxNot yet available
- PIEE Solicitation Module Link for W9127826RA046Not yet available
- Registration Instructions for the PIEE Solicitation ModuleNot yet available
Contacts
Similar contracts
- Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VADue Sep 1, 2026
- Fy26 Houston Ship Channel, Texas Bayport Flare Hopper DredgingDue Oct 2, 2026
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Sep 17, 2026
- Sand Trail Phase IIAlaskaDue Sep 10, 2026
- Gulf Intracoastal Waterway, Texas High Island to Causeway and Channel to Port Bolivar Pipeline Maintenance DredgingTexasDue Sep 15, 2026