MOTCO Rail Curves Package 3
- Response deadline
- Jul 27, 2026 Closed
- Date posted
- Jun 25, 2026
- Source
- Open notice
Description
** Note - the table of contents in this solicitation attachment is incorrect. The attachments included in this PIEE solicitation post are the correct attachments for this requirement. A forthcoming amendment with the correct table of contents will be posted.**Scope of this project is the repair of approximately 2,500 LF by replacement, including repairs of ties, rails, turnouts, rail crossings and other track material for multiple rail curves on the tidal side of the installation at Military Ocean Terminal, Concord (MOTCO). The base bid package includes repair by replacement of curves 9 and 10 with curvature less than 12 degrees. Tracks will be constructed per standards in UFC 4-860-01FA and American Railway Engineering and Maintenance of Way Association (AREMA). The following work will be included as contract options:- UXO clearance and transportation,- UXO blow-in-place,- Mission stand down, - Wetland mitigation credit purchase
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VADue Sep 1, 2026
- Fy26 Houston Ship Channel, Texas Bayport Flare Hopper DredgingDue Oct 2, 2026
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Sep 17, 2026
- Sand Trail Phase IIAlaskaDue Sep 10, 2026
- Gulf Intracoastal Waterway, Texas High Island to Causeway and Channel to Port Bolivar Pipeline Maintenance DredgingTexasDue Sep 15, 2026