Vertical Construction Multiple Award Contract (MAC)
- Response deadline
- —
- Date posted
- Aug 31, 2026
- Source
- Open notice
Description
PRIMARY MAC - The purpose of the Vertical Construction MAC is to provide design-bid-build and design-build construction services for a broad range of military renovation and construction projects, primarily in support of the Malmstrom AFB installation, Launch Facilities (LF), and Missile Alert Facilities (MAFs). Work performed under Vertical Construction MAC orders may include but is not limited to the repair, renovation, alteration, and/or demolition of various vertical structures, building equipment & systems (plumbing, electrical, HVAC, fire suppression, etc.), and interior/exterior finishes. The initial ordering period is projected to be five (5) years with a two (2) year option year (potential total contract length of seven (7) years) and will have an estimated overall contract ceiling of $99,999,999.99. SEED PROJECT – The proposed initial task order to be awarded under the Vertical Construction MAC is the DSN/CSN Repair Bldg. 1082 HVAC project on Malmstrom AFB, MT. This project consists of developing conceptual documents for two (2) courses of action (COAs) to provide backup cooling and humidification along with a rough order of magnitude for each COA. The COAs should include HVAC components similar to the existing system. The Government will select one (1) COA to take to the 65% design and develop into a 100% Type B design. The seed project period of performance is 242 calendar days after receipt of notice to proceed (NTP). Construction may commence after acceptance of the 65% design.
Classifications
Documents (8)
- 4_ACM Report_2015 - DRAFT.pdf.pdf1.4 MBNot yet available
- 2_As Builts 2009 HVAC - DRAFT.pdf.pdf9.2 MBNot yet available
- 4_Bldg. 1082 Asb Pb Survey Results_2009 - DRAFT.pdf.pdf3.8 MBNot yet available
- 3_Bldg. 1082 HVAC Submittal Schedule - DRAFT.pdf.pdf572 KBNot yet available
- 1_Design Build SOW - DRAFT.pdf.pdf715 KBNot yet available
- Solicitation - FA462626R0007 - DRAFT.pdf.pdf1.8 MBNot yet available
- Vertical MAC Pre-Sol Notice.pdf.pdf121 KBNot yet available
- 2_BW As-Builts 2009 HVAC B 1082.pdf.pdf1.7 MBNot yet available
Contacts
- cody.babinecz@us.af.mil4067314608
- colleen.goad.1@us.af.mil4067313473
Similar contracts
- Munitions Maintenance and Inspection (M&I) Facility & Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HIHawaiiDue Sep 16, 2026
- https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=05987caa4ecd43b4bd672664ecc1315dHawaii
- Total Maintenance for Critical Facilities at USAG Humphreys and Camp YonginDue Sep 29, 2026
- FEMA Region 6 Federal Regional Center Upper-Level Watch RenovationTexasDue Sep 2, 2026
- Well #11 - Well, Rehabilitation, and Pump Building 1530 STAG4F FMDNorth CarolinaDue Sep 9, 2026