Civic AI
Civic AI
Procurement intelligence
SAM.gov36C26326B0032
Open

Y1DA--656-26-201 Replace Carpet FY26 NRM 36C263-26-AP-2448

Response deadline
Aug 20, 2026
Due in 8 days
Date posted
Jul 20, 2026

Description

The Contractor shall furnish all labor, materials, tools, and equipment necessary to remove existing flooring and install new resilient flooring and base in occupied healthcare facilities with minimal disruption, improving durability, infection control, safety, and maintainability. Work shall comply with FAR, VAAR, VA, ICRA standards, and SCVAHCS requirements. Contractor shall field-verify all quantities and conditions prior to installation; any discrepancies must be reported to the COR immediately. No substitutions for specified products without CO approval. Work shall be performed in full accordance with the technical specifications including, but not limited to: Sections 00 01 15, 01 33 23, 01 35 26, 01 45 00, 01 57 19, 01 74 19, 02 41 00, 02 82 13.19, 07 84 00, 09 05 16, 09 65 19, 09 68 00 (demo only), and 09 91 00 (touch-up painting). The Contractor shall execute all work in accordance with the VA provided phasing drawings and written direction, including the sequencing for Buildings 2, 1, 28, and 29. No deviations from the approved phasing shall occur without written approval from the COR and CO. Each building shall be fully completed before mobilizing to the next, unless otherwise directed in writing. POP: 565 days after NTP

Classifications

Documents (10)

  • Attachement H NARA Records Management Language for Contracts -3 Pages.pdf
    .pdf75 KBNot yet available
  • Attachement G Specifications Manual -224 Pages.pdf
    .pdf1.2 MBNot yet available
  • Attachement A SOW 656-26-201 Replace Carpet - 10 Pages.pdf
    .pdf256 KBNot yet available
  • Attachement F Exhibit B_7-9-26 -1 Pages.pdf
    .pdf630 KBNot yet available
  • 36C26326B0032.docx
    .docx79 KBNot yet available
  • Attachement C - Questions Request Form - 1 Page.pdf
    .pdf65 KBNot yet available
  • Attachement B P07 Wage Determination as of 5-29-2026 -6 Pages.pdf
    .pdf73 KBNot yet available
  • Attachement D - VAAR 852.219-75 Limitations on Subcontracting-Cert of -2 Pages.pdf
    .pdf245 KBNot yet available
  • Attachement I Single Source Justification MPT to SAT - 656-26-201 ER 7-14-2026.pdf
    .pdf327 KBNot yet available
  • Attachement E Exhibit A_7-9-26 -7 Pages.pdf
    .pdf5.1 MBNot yet available

Contacts

Similar contracts

Explore more