Miter Gate Strut Arm Assemblies
- Response deadline
- Aug 25, 2026 Closed
- Date posted
- Jul 21, 2026
- Source
- Open notice
Description
The U.S. Army Corps of Engineers - St. Paul District requires a contractor to fabricate and deliver four (4) Miter Gate Strut Arm Assemblies, with an Option for four (4) additional assemblies, exercisable at the time of contract award. The strut arm assemblies are 18 ft 4 inches in length, fabricated from various grades of steel. Fabricator must have one of the following AISC certifications: IBR: Certified Bridge Fabricator - Intermediate with critical fracture endorsement; ABR: Certified Bridge Fabricator - Advanced with fracture critical endorsement; or HYD: Certified Hydraulic Steel Structures Fabricator (includes fracture critical endorsement). Fabricator must also be certified under the AISC Quality Certification Program with an endorsement for applying sophisticated paint systems (SPS) in Category P1, P2, or P3. The contract will involve extensive QC and QA testing for the casting, machining and painting. Strut arm assemblies will be delivered to the USACE Fountain City, WI Service Base no later than 1 July 2027. The solicitation is 100% set-aside for Small Businesses under NAICS 332312, with an SBA size standard of 500 employees. Firms must be fully registered in the System for Award Management (SAM) to be eligible to receive Federal Government contracts.
Classifications
- PSC5450
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Gooseneck Flatbed TrailerDue Sep 28, 2026
- Dredge Goetz Pipe FloatsDue Oct 5, 2026
- Oil PurifierDue Sep 23, 2026
- Removal of Dead Ash Trees, Eau Galle ProjectDue Sep 28, 2026
- Oil PurifierDue Sep 23, 2026
- LD3 Tree RemovalDue Sep 23, 2026