SAM.govW519TC26RACWP
Open
LCAAP Contaminated Waste Plant W519TC-26-R-ACWP
DEPT OF DEFENSE · Missouri
- Response deadline
- Sep 1, 2026 Due in 13 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
Requirement includes construction of a new decontamination facility, demolition and replacement of the pyrotechnic waste treatment facility, refurbishment of the neutralized explosive wastewater treatment facility, and demolition of and replacement of a neutralized explosive wastewater lift station at Lake City Army Ammunition Plant (LCAAP).
Classifications
Documents (25)
- Attachment 0002 - Representation and Certification LCAAP CWP.pdf.pdf225 KBNot yet available
- CWPF-C-002_CIVIL_LEGEND_AND_ABBREVIATIONS_REV1.zip.zip6.0 MBNot yet available
- W519TC-26-R-ACWP RFS.pdf.pdf201 KBNot yet available
- Specifications for Reference.pdf.pdf53.1 MBNot yet available
- 1Drawings_Part_A_VOL_1a.pdf.pdf81.6 MBNot yet available
- Amendment_0006_Technical_Docs.zip.zip4.8 MBNot yet available
- 1Drawings_Part_B_VOL_2.pdf.pdf50.0 MBNot yet available
- 1Drawings_Part_D_VOL_4.pdf.pdf12.8 MBNot yet available
- 1Drawings_Part_C_VOL_3.pdf.pdf45.9 MBNot yet available
- B160-C-002_CIVIL_LEGEND_AND_ABBREVIATIONS_REV1.zip.zip1.7 MBNot yet available
- Amendment_004.zip.zip87.3 MBNot yet available
- B.08.03_Amendment_04_SF30_20260527.pdf.pdf26.6 MBNot yet available
- LCAAP Cont Waste Design Analysis Final Submittal_02242025_Part3.pdf.pdf82.3 MBNot yet available
- LCAAP Cont Waste Design Analysis Final Submittal_02242025_Part5.pdf.pdf61.8 MBNot yet available
- LCAAP Cont Waste Design Analysis Final Submittal_02242025_Part2.pdf.pdf138.4 MBNot yet available
- Interested Parties.xlsx.xlsx17 KBNot yet available
- CWP Site Visit Photos.zip.zip207.8 MBNot yet available
- LCAAP Cont Waste Design Analysis Final Submittal_02242025_Part4.pdf.pdf117.2 MBNot yet available
- W519TC-26-R-ACWP AMD 0002 RFS.pdf.pdf205 KBNot yet available
- LCAAP Cont Waste Design Analysis Final Submittal_02242025_Part6.pdf.pdf58.0 MBNot yet available
- B161-C-002_CIVIL_LEGEND_AND_ABBREVIATIONS_REV1.zip.zip2.1 MBNot yet available
- W519TC-26-R-ACWP AMD 0001 RFS.pdf.pdf282 KBNot yet available
- 1Drawings_Part_A_VOL_1b.pdf.pdf38.4 MBNot yet available
- LCAAP Cont Waste Design Analysis Final Submittal_02242025_Part1.pdf.pdf206.7 MBNot yet available
- Building_161_Photos.zip.zip72.1 MBNot yet available
Contacts
Similar contracts
- Tinker AFB 2026 Multiple Award Construction Contract (MACC)OklahomaDue Sep 11, 2026
- EIE466 ADAL JPARC Range Operations Center, Eielson Air Force Base, AlaskaAlaskaDue Aug 28, 2026
- B145 DCMA Office Space RenovationNew HampshireDue Aug 28, 2026
- EIE466 ADAL JPARC Range Operations Center, Eielson Air Force Base, AlaskaAlaskaDue Aug 21, 2026
- JM26 CNIC BLDG 1909 Kitchen Silica Dust Cleaning and Floor RepairDue Aug 24, 2026
- 88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS- SOLICITATIONDue Sep 16, 2026