J--Backflow Replacement (3) at Gateway Arch Natl Park
- Response deadline
- Aug 19, 2026 Due in 7 days
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Backflow replacement (3) at Gateway Arch National Park The purpose of this amendment (0001) is to provide the site-visit roster, and the answer to the one question asked thus far. Q1. How will the awardee gain access to the park? A1. Once the contract is awarded, the contractor will receive an email with an access request form. We will need the vehicle and drivers' information, or Law Enforcement Dispatch Center will run the vehicle and driver. Once cleared, the contractor will get a sticker that will allow them to enter the park. Submit all questions only via email to james_bissaillon@ios.doi.gov by August 13, 2026, to ensure enough time to provided answers. Quotes are due by 5:00 PM CDT on August 19, 2026, unless changed by solicitation amendment. Remember to monitor the solicitation posting for any amendments posted until the solicitation closes. All amendments must be acknowledged by the due date and time for quotes.
Classifications
Documents (7)
- DownloadSol_140P6026Q0061_Amd_0001.pdf.pdf203 KB
- DownloadB11_Site_Visits_(140P6026Q0061_Sign-in_Sheet)_0001.pdf.pdf362 KB
- DownloadSol_140P6026Q0061.pdf.pdf314 KB
- DownloadAttachment_04_-_B08_Solicitation_(140P6026Q0061_Technical_Questionnaire).pdf.pdf308 KB
- DownloadAttachment_01_-_A04_SOW.pdf.pdf235 KB
- DownloadAttachment_03_-_B03_DOL_Wage_Determination_(140P6026Q0038_2015-5075_Rev_33).pdf.pdf68 KB
- DownloadAttachment_02_-_A04_SOW_(Appendix_A_Updated_6-26-2026).pdf.pdf1.6 MB
Contacts
Similar contracts
- J--HVAC PREVENTATIVE MAINTENANCE SERVICE AT FORT MCHEDue Aug 26, 2026
- NH-GREAT BAY NWR HVAC SYSTEM REPLACEMENTDue Aug 26, 2026
- C--HVAC Hot Water Supply Line Repair Due Aug 21, 2026
- Z2DA--Replace Water Heater and Boilers Out BuildingsTexasDue Aug 14, 2026
- FY 2026 Preventive Maintenance Services to the Building Automation SystemEstuaireDue Sep 14, 2026
- 31100PR260000060-Replace vertical package unit located at Building 38CaliforniaDue Aug 21, 2026